Mixed-integer linear programming model for tree-like pipeline scheduling problem with intermediate due dates on demands
| Year of publication: |
2020
|
|---|---|
| Authors: | Taherkhani, M. ; Seifbarghy, M. ; Tavakkoli-Moghaddam, R. ; Fattahi, P. |
| Published in: |
Operational research : an international journal. - Berlin : Springer, ISSN 1866-1505, ZDB-ID 2425760-6. - Vol. 20.2020, 1, p. 399-425
|
| Subject: | Multi-product pipelines | Tree-like structure | Scheduling | Mixed-integer linear programming | Scheduling-Verfahren | Scheduling problem | Mathematische Optimierung | Mathematical programming | Theorie | Theory | Produktionsplanung | Production planning |
-
Simultaneous lot sizing and scheduling in the animal feed premix industry
Milenković, Miloš, (2023)
-
Liu, Qihao, (2023)
-
De Smet, Niels, (2020)
- More ...
-
A two-echelon inventory model with lost sales
Hill, R.M., (2007)
-
A two-echelon inventory model with lost sales
Hill, R.M., (2007)
-
A new decision-making structure for the order entry stage in make-to-order environments
Ebadian, M., (2008)
- More ...