Modified simulated annealing based approach for multi objective facility layout problem
Year of publication: |
2013
|
---|---|
Authors: | Matati, Rajesh ; Singh, Surya Prakash ; Mittal, M. L. |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 51.2013, 14 (15.7.), p. 4273-4288
|
Subject: | facility layout | heuristics | simulated annealing | Heuristik | Heuristics | Fabrikplanung | Facility layout | Simulation | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | Materialfluss | Material flow | Produktionsplanung | Production planning |
-
Kheirkhah, Amir Saman, (2018)
-
Chan, Wai Kin, (2013)
-
Modelling and optimisation of facility layout problem using firefly algorithm
Sarwar, Ferdous, (2020)
- More ...
-
Performance measurement in automated manufacturing
Mathur, Alok, (2011)
-
A multi-agent system for decentralized multi-project scheduling with resource transfers
Adhau, Sunil, (2013)
-
Multi-site integrated production and distribution planning : a multi-objective approach
Badhotiya, Gaurav Kumar, (2018)
- More ...