Multi-objective flow shop scheduling using hybrid simulated annealing
Ashwani Dhingra and Pankay Chandna
Year of publication: |
2010
|
---|---|
Authors: | Dhingra, Ashwani ; Chandna, Pankay |
Published in: |
Measuring business excellence : the journal of organizational performance management. - Bingley : Emerald Group Publ., ISSN 1368-3047, ZDB-ID 2038133-5. - Vol. 14.2010, 3, p. 30-41
|
Subject: | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | Algorithmus | Algorithm | Experiment |
Saved in:
Saved in favorites
Similar items by subject
-
Zhu, Guang-Yu, (2018)
-
Ren, Weibo, (2021)
-
Zhang, Zikai, (2021)
- More ...
Similar items by person
-
Multi‐objective flow shop scheduling using hybrid simulated annealing
Dhingra, Ashwani, (2010)
- More ...