Multi-objective optimal operation strategy study of micro-CCHP system
Year of publication: |
2012
|
---|---|
Authors: | Wu, Jing-yi ; Wang, Jia-long ; Li, Sheng |
Published in: |
Energy. - Elsevier, ISSN 0360-5442. - Vol. 48.2012, 1, p. 472-483
|
Publisher: |
Elsevier |
Subject: | Combined cooling | Heating and power (CCHP) | Multi-objective optimization | MINLP | Operation strategy |
-
Shao, Youyuan, (2020)
-
Complementary configuration and operation of a CCHP-ORC system
Fang, Fang, (2012)
-
Sanaye, Sepehr, (2014)
- More ...
-
Strategie asset allocation in the post-crisis world
Li, Sheng, (2011)
-
Economic structure, cost outsourcing and global imbalances
Sheng, Li, (2014)
-
Revisiting global imbalances : A comparative analysis of income and consumption inequality
Sheng, Li, (2021)
- More ...