New bounds and approximations for the probability distribution of the length of the critical path
Year of publication: |
2004
|
---|---|
Authors: | Prékopa, András ; Long, Jianmin ; Szántai, Tamás |
Published in: |
Dynamic stochastic optimization : [this volume includes a selection of papers presented at the IFIP/IIASA/GAMM-Workshop on "Dynamic Stochastic Optimization" held at the International Institute for Systems Analysis (IIASA), Laxenburg, Austria, March 11 - 14, 2002]/ Kurt Marti ... (eds.). - Berlin : Springer, ISBN 3-540-40506-2. - 2004, p. 293-320
|
Subject: | Netzplantechnik | Project network techniques | Mathematische Optimierung | Mathematical programming | Terminplanung | Time scheduling | Statistische Verteilung | Statistical distribution | Theorie | Theory |
-
Projektplanung : Modelle, Methoden, Management
Zimmermann, Jürgen, (2006)
-
Projektplanung : Modelle, Methoden, Management : mit 95 Tabellen
Zimmermann, Jürgen, (2010)
-
A new path-based cutting plane approach for the discrete time-cost tradeoff problem
Hadjiconstantinou, Eleni, (2010)
- More ...
-
Prékopa, András, (2012)
-
Editorial: Stochastic modeling and optimization (in honor of András Prékopa's 80th birthday)
Dentcheva, Darinka, (2012)
-
Reliability type inventory models : a survey
Prékopa, András, (1981)
- More ...