Novel method for welding gantry robot scheduling at shipyards
Year of publication: |
2023
|
---|---|
Authors: | Lee, Jongsung ; Kim, Byung-In ; Nam, Mihee |
Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 61.2023, 17, p. 5842-5859
|
Subject: | heuristics | mixed-integer linear programming | scheduling | shipbuilding | Welding gantry robot | Roboter | Robot | Scheduling-Verfahren | Scheduling problem | Schiffbau | Shipbuilding industry | Heuristik | Heuristics | Mathematische Optimierung | Mathematical programming | Theorie | Theory |
-
Rose, Christopher Daniel, (2015)
-
Sugianto, Willy Chandra, (2024)
-
A GRASP approach to transporter scheduling for ship assembly block operations management
Park, Changkyu, (2013)
- More ...
-
The nuclear medicine production and delivery problem
Lee, Jongsung, (2014)
-
The nuclear medicine production and delivery problem
Lee, Jongsung, (2014)
-
Lee, Jongsung, (2013)
- More ...