//-->
On the Polyhedral Structure of a Multi-Item Production Planning Model with Setup Times.
Miller, A.J., (2000)
A Multi-Item Prosuction Planning Model with Setup Times : Algorithms, Reformulations and Polyhedral Characterizations for a Special Case.
Miller, A.J., (2001)
Solving Multi-Item Capacitated Lot-Sizing Problems with Setup Times by Branch-and-Cut.