//-->
A mathematical model and a heuristic procedure for the turbine balancing problem
Fathi, Y., (1993)
On the sensitivity of project variability to activity mean duration
Elmaghraby, S.E., (1999)
Heuristic procedures for the parallel machine problem with tool switches
Fathi, Y., (2002)