//-->
Advances in production management systems 85 : proceedings of the Second IFIP WG 5.7 Working Conference on Advances in Production Management Systems - APMS 85, Budapest, Hungary, 27 - 30 August, 1985
Browne, Jimmie, (1986)
Flexibilität in der Auftragsabwicklung
Hoffmann, Heinz-Peter, (1986)
Application of the branch and bound technique to some flow-shop scheduling problems
Ignall, Edward, (1965)
On a multi-period assignment problem
Werra, D. de, (1977)
Decomposition of bipartite multigraphs into methodings
Werra, D. de, (1972)
An introduction to timetabling
Werra, D. de, (1985)