On the two-stage assembly flow shop problem
Year of publication: |
2024
|
---|---|
Authors: | Hadda, Hatem ; Dridi, Najoua ; Hajri-Gabouj, Sonia |
Published in: |
Top : an official journal of the Spanish Society of Statistics and Operations Research. - Berlin : Springer, ISSN 1863-8279, ZDB-ID 2322573-7. - Vol. 32.2024, 2, p. 224-244
|
Subject: | Assembly flow shop | Branch and bound | Dominance rule | Heuristic | Lower bound | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Heuristik | Heuristics | Produktionssteuerung | Production control | Theorie | Theory | Branch-and-Bound | Branch and Bound |
-
Schaller, Jeffrey, (2019)
-
Exact and heuristic algorithms for the just-in-time scheduling problem in a batch processing system
Parsa, N. Rafiee, (2017)
-
Scheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshop
Jafari-Nodoushan, Abbasali, (2021)
- More ...
-
Hadda, Hatem, (2010)
-
On the two-stage hybrid flow shop with dedicated machines
Hadda, Hatem, (2015)
-
On the optimality conditions of the two-machine flow shop problem
Hadda, Hatem, (2018)
- More ...