//-->
Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates
Lee, Wen-chiung, (2009)
The two-machine flowshop no-wait scheduling problem with a single server to minimize the total completion time
Su, Ling-Huey, (2008)
Minimizing the total completion time in a two-machine flowshop with sequence-independent setup times
Ladhari, T., (2012)
A note on "On three-machine flow shop scheduling with deteriorating jobs"
Jafari, Abbas-Ali, (2017)
Flow shop makespan minimization scheduling with deteriorating jobs under dominating machines
Sun, Linhui, (2012)
A note on flow shop scheduling problems with deteriorating jobs on no-idle dominant machines
Sun, Linhui, (2010)