Online hierarchical parallel-machine scheduling in shared manufacturing to minimize the total completion time
Year of publication: |
2023
|
---|---|
Authors: | Wei, Qi ; Wu, Yong ; Cheng, T. C. E. ; Sun, Fengxin ; Jiang, Yiwei |
Published in: |
Journal of the Operational Research Society. - London : Taylor and Francis, ISSN 1476-9360, ZDB-ID 2007775-0. - Vol. 74.2023, 11, p. 2432-2454
|
Subject: | competitive ratio | hierarchical scheduling | online algorithm | Share manufacturing | Scheduling-Verfahren | Scheduling problem | Algorithmus | Algorithm | Durchlaufzeit | Lead time | Industrie | Manufacturing industries | Produktionssystem | Manufacturing system | Heuristik | Heuristics | Produktionssteuerung | Production control |
-
Rakrouki, Mohamed Ali, (2012)
-
Minimizing the total completion time in a two-machine flowshop with sequence-independent setup times
Ladhari, T., (2012)
-
Soares, Leonardo C. R., (2024)
- More ...
-
Wei, Qi, (2019)
-
Ji, Min, (2022)
-
Two parallel-machine scheduling with maximum waiting time for an emergency job
Jiang, Yiwei, (2024)
- More ...