//-->
MIP models for minimizing total tardiness in a two-machine flow shop
Kharbeche, M., (2013)
Effect of lot-size reduction and continuous improvement programmes on work in process and utilisation : a study for single-machine and flow-shop environments
Godinho Filho, Moacir, (2012)
Towards an integrated workload control (WLC) concept : the performance of due date setting rules in job shops with contingent orders
Thürer, Matthias, (2013)
Online scheduling of two job types on a set of multipurpose machines
Karhi, Shlomo, (2014)
On the optimality of the TLS algorithm for solving the online-list scheduling problem with two job types on a set of multipurpose machines
Karhi, Shlomo, (2013)