Optimal cyclic scheduling of a robotic flowshop with multiple part types and flexible processing times
Year of publication: |
2014
|
---|---|
Authors: | Lei, Weidong ; Che, Ada ; Chu, Chengbin |
Published in: |
European journal of industrial engineering : EJIE. - Genevè : Inderscience Enterprises Ltd., ISSN 1751-5254, ZDB-ID 2384377-9. - Vol. 8.2014, 2, p. 143-167
|
Subject: | cyclic hoist scheduling | robotic flowshop | minimal part set | MPS | banch-and-bound algorithm | flexible processing times | Scheduling-Verfahren | Scheduling problem | Roboter | Robot | Durchlaufzeit | Lead time | Algorithmus | Algorithm | Flexibles Fertigungssystem | Flexible manufacturing system | Theorie | Theory |
-
Scheduling multiple robots in a no-wait re-entrant robotic flowshop
Che, Ada, (2011)
-
Penz, Louise, (2023)
-
Throughput optimization in two-machine flowshops with flexible operations
Crama, Yves, (2010)
- More ...
-
Lei, Weidong, (2014)
-
Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots
Che, Ada, (2009)
-
Robust optimization for the cyclic hoist scheduling problem
Che, Ada, (2015)
- More ...