//-->
Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint
Louly, Mohamed-Aly, (2013)
A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint
Louly, Mohamed-Aly, (2012)
Optimal time phasing and periodicity for MRP with POQ policy
Louly, Mohamed-Aly, (2011)