Optimization-Based Manufacturing Scheduling with Multiple Resources, Setup Requirements, and Transfer Lots
Year of publication: |
2003
|
---|---|
Authors: | Chen, Dong ; Luh, Peter B. ; Thakur, Lakshman S. ; Moreno Jr, Jack |
Published in: |
IIE transactions / Institute of Industrial Engineers, Norcross, Ga : industrial engineering and development. - Philadelphia, Pa : Taylor & Francis, ISSN 0569-5554, ZDB-ID 2460191. - Vol. 35.2003, 10, p. 973
|
Saved in:
Saved in favorites
Similar items by person
-
Classified boards, the cost of debt, and firm performance
Chen, Dong, (2012)
-
The non-monotonic effect of board independence on credit ratings
Chen, Dong, (2014)
-
Thermoeconomic operation optimization of a coal-fired power plant
Xiong, Jie, (2012)
- More ...