//-->
Towards an integrated workload control (WLC) concept : the performance of due date setting rules in job shops with contingent orders
Thürer, Matthias, (2013)
Multiobjective unrelated parallel machines scheduling problem with periodic maintenance activities and dependent processing times
Yaghtin, Mohammad, (2025)
A flow shop batch scheduling model with pre-processing and time-changing effects to minimize total actual flow time
Kurniawan, Dwi, (2024)
Outsourcing and scheduling for two-machine ordered flow shop scheduling problems
Chung, Dae-Young, (2013)
JUST-IN-TIME SCHEDULING UNDER SCENARIO-BASED UNCERTAINTY
CHUNG, DAE-YOUNG, (2013)