Parallel-machine scheduling with machine-dependent maintenance periodic recycles
| Year of publication: |
April 2017
|
|---|---|
| Authors: | Li, Guo ; Liu, Mengqi ; Sethi, Suresh P. ; Xu, Dehua |
| Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 186.2017, p. 1-7
|
| Subject: | Scheduling | Maintenance | Periodic recycle | Makespan | Heuristic algorithm | Scheduling-Verfahren | Scheduling problem | Instandhaltung | Maintenance policy | Kreislaufwirtschaft | Recycling | Heuristik | Heuristics | Algorithmus | Algorithm | Durchlaufzeit | Lead time | Theorie | Theory |
-
Makespan minimisation with sequence-dependent machine deterioration and maintenance events
Ruiz-Torres, Alex J., (2017)
-
Single machine total completion time scheduling problem with workload-dependent maintenance duration
Xu, Dehua, (2014)
-
Pacheco, JoaquĆn, (2013)
- More ...
-
Parallel-Machine Scheduling With Machine-Dependent Maintenance Periodic Recycles
Li, Guo, (2020)
-
Online platform service investment : a bane or a boon for supplier encroachment
Zhang, Xuefeng, (2021)
-
Li, Guo, (2020)
- More ...