Perfomance prediction of an unreliable flexible manufacturing cell with double gripper robot
Year of publication: |
2015
|
---|---|
Authors: | Jain, Madhu ; Sharma, G. C. ; Sharma, Pankaj |
Published in: |
International journal of logistics systems and management. - Olney : Inderscience, ISSN 1742-7967, ZDB-ID 2178795-5. - Vol. 21.2015, 1, p. 46-69
|
Subject: | flexible manufacturing cell | FMC | double gripper robot | pallet | common cause failure | Runge-Kutta | R.-K. | Roboter | Robot | Flexibles Fertigungssystem | Flexible manufacturing system | Fertigungsinsel | Cellular manufacturing |
-
Multiple part-type scheduling in flexible robotic cells
Batur, G. Didem, (2011)
-
Bicriteria robotic operation allocation in a flexible manufacturing cell
Gultekin, Hakan, (2010)
-
Flexible robotic manufacturing cell scheduling problem with multiple robots
Yang, Yujun, (2016)
- More ...
-
Jain, Madhu, (2016)
-
Jain, Madhu, (2016)
-
Jain, Madhu, (2011)
- More ...