Performance Evaluation of a production Line with Random Processing Times Under Cyclical Scheduling.
Year of publication: |
1997
|
---|---|
Authors: | Tan, B. ; Karabati, S. |
Institutions: | İktisat Bölümü, İktisadi ve İdari Bilimler Fakültesi |
Subject: | PRODUCTION | MANUFACTURING SYSTEMS |
-
Tan, B., (1997)
-
Reliability Modelling of Manufacturing Systems with Multiple Repair Modes
Calabria, R., (1989)
-
Rivera-Gómez, Héctor, (2013)
- More ...
-
Stochastic Cyclic Scheduling Problem in Synchronous Assembly and Production Lines
Tan, B., (1997)
-
Cyclic Scheduling in Synchronous Production Lines.
Kouvelis, P., (1997)
-
Variance of the Output as a Function of Time: Production Line Dynamics
Tan, B., (1997)
- More ...