Permutation flowshops in group scheduling with sequence-dependent setup times
Year of publication: |
2012
|
---|---|
Authors: | Naderi, B. ; Salmasi, Nasser |
Published in: |
European Journal of Industrial Engineering. - Inderscience Enterprises Ltd, ISSN 1751-5254. - Vol. 6.2012, 2, p. 177-198
|
Publisher: |
Inderscience Enterprises Ltd |
Subject: | sequence-dependent setup times | flow shop scheduling | mixed integer linear programming | MILP | hybrid metaheuristics | group scheduling | permutation flow shops | genetic algorithms | simulated annealing | mathematical modelling |
-
Sivakumar, P., (2008)
-
Bi-criteria group scheduling in hybrid flowshops
Bozorgirad, Mir Abbas, (2013)
-
Cell loading and family scheduling for jobs with individual due dates to minimise maximum tardiness
Süer, Grüsel A., (2014)
- More ...
-
Permutation flowshops in group scheduling with sequence-dependent setup times
Naderi, B., (2012)
-
Permutation flowshops in group scheduling with sequence-dependent setup times
Naderi, B., (2012)
-
Modeling and scheduling no-wait open shop problems
Naderi, B., (2014)
- More ...