Pre-emptive resource-constrained project scheduling with setup times
Resource-constrained project scheduling with activity pre-emption assumes that activities are allowed to be interrupted and restarted later in the schedule at no extra cost. In the current paper, we extend this pre-emptive scheduling problem with setup times between activity interruptions and the possibility to fast track pre-emptive subparts of activities. The contribution of the paper is twofold. First, we present an optimal branch-and-bound procedure for the pre-emptive resource-constrained project scheduling problem with setup times and fast tracking options. Second, we test the impact of these pre-emptive extensions to the quality of the schedule from a lead-time point-of-view.
Year of publication: |
2006-06-05
|
---|---|
Authors: | Debels, D. ; Vanhoucke, M. |
Institutions: | Vlerick Business School |
Saved in:
freely available
Saved in favorites
Similar items by person
-
Debels, D., (2006)
-
Debels, D., (2006)
-
A finite capacity production scheduling procedure for a belgian steel company
Debels, D., (2006)
- More ...