//-->
Robust planning in optimization for production system subject to random machine breakdown and failure in rework
Chiu, Singa Wang, (2010)
Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown
Chiu, Singa Wang, (2013)
Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework