Production lot sizing and scheduling with non-triangular sequence-dependent setup times
| Year of publication: |
2014
|
|---|---|
| Authors: | Clark, Alistair ; Mahdieh, Masoumeh ; Rangel, Socorro |
| Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 52.2014, 8 (15.4.), p. 2490-2503
|
| Subject: | lot sizing and scheduling | sequence-dependent setup times | non-triangular setup times | Durchlaufzeit | Lead time | Losgröße | Lot size | Scheduling-Verfahren | Scheduling problem | Produktionssteuerung | Production control | Theorie | Theory | Mathematische Optimierung | Mathematical programming | Produktionsplanung | Production planning |
-
Carvalho, Desiree M., (2022)
-
Araujo, K. A. G., (2023)
-
Toledo, Claudio Fabiano Motta, (2014)
- More ...
-
A review of mathematical optimization models applied to the sugarcane supply chain
Teixeira, Eduardo dos Santos, (2021)
-
Solution approaches for the soft drink integrated production lot sizing and scheduling problem
Ferreira, Deisemara, (2009)
-
Copus, Colin, (2010)
- More ...