Production scheduling and truck dispatching of ready mixed concrete
In this research, we develop an integrated model that combines ready mixed concrete (RMC) production scheduling and truck dispatching in the same framework. The model is formulated as a mixed integer network flow problem with side constraints, which is characterized as NP-hard. To solve realistic problems, we develop a solution method, which incorporates a mathematical programming solver. To evaluate the model and the solution method, numerical tests using real operating data from an RMC firm in Taiwan are performed. The test results show that the model and the solution algorithm would be useful for actual operations.
Year of publication: |
2008
|
---|---|
Authors: | Yan, Shangyao ; Lai, Weishen ; Chen, Maonan |
Published in: |
Transportation Research Part E: Logistics and Transportation Review. - Elsevier, ISSN 1366-5545. - Vol. 44.2008, 1, p. 164-179
|
Publisher: |
Elsevier |
Keywords: | Ready mixed concrete RMC truck Scheduling Time space network Network flow problem with side constraints |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Production scheduling and truck dispatching of ready mixed concrete
Yan, Shangyao, (2008)
-
Corporate Tax Avoidance and Firm Diversification : Evidence from Chinese Listed Firms
Qin, Zhigang, (2021)
-
Multiple large shareholders, investment efficiency and corporate tax avoidance : evidence from China
Yu, Xiaohong, (2024)
- More ...