//-->
Project scheduling with resource constraints : a branch and bound approach
Christofides, Nicos, (1987)
A heuristic to schedule flexible job-shop in a glass factory
Alvarez-Valdes, R., (2005)
A hybrid GRASP/VND algorithm for two- and three-dimensional bin packing
ParreƱo, F., (2010)