//-->
The Weibull scheduling index for client driven manufacturing processes
Mallor, Fermin, (2014)
Continuous-time algorithms for scheduling a single machine with sequence-dependent setup times and time window constraints in coordinated chains
Jula, Payman, (2013)
Decision-making on multi-mould maintence in production scheduling
Wong, C. S., (2014)
A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
Artigues, Christian, (2000)
A Petri net model and a general method for on and off-line multi-resource shop floor scheduling with setup times
Artigues, Christian, (2001)
Production scheduling
Lopez, Pierre, (2008)