Resource-constrained project scheduling with flexible resource profiles in continuous time
Year of publication: |
August 2017
|
---|---|
Authors: | Naber, Anulark |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 84.2017, p. 33-45
|
Subject: | Project scheduling | Flexible profiles | Continuous-time MIP model | Branch-and-cut | Valid inequalities | Theorie | Theory | Projektmanagement | Project management | Scheduling-Verfahren | Scheduling problem | Engpass | Bottleneck | Flexibles Fertigungssystem | Flexible manufacturing system |
-
MIP models for resource-constrained project scheduling with flexible resource profiles
Naber, Anulark, (2014)
-
Resource-constrained project scheduling with concave processing rate functions
Steeneck, Daniel W., (2015)
-
Quality- and profit-oriented scheduling of flexible resource-constrained projects
Kellenbrink, Carolin, (2014)
- More ...
-
MIP models for resource-constrained project scheduling with flexible resource profiles
Naber, Anulark, (2014)
-
Comments on the RCPSP-Model of Bianco and Caramia (2013)
Naber, Anulark, (2013)
-
MIP models for resource-constrained project scheduling with flexible resource profiles
Naber, Anulark, (2014)
- More ...