Resource leveling scheduling by an ant colony-based model
Mohsen Garmsiri and Mohammad Abassi
In project scheduling, many problems can arise when resource fluctuations are beyond acceptable limits. To overcome this, mathematical techniques have been developed for leveling resources. However, these produce a hard and inflexible approach in scheduling projects. The authors propose a simple resource leveling approach that can be used in scheduling projects with multi-mode execution activities. In the mentioned approach, an ant algorithm determines the execution mode of each activity so that resource leveling index and project time become optimum. In the model, some visibility functions (defined in accordance with problem characteristics) are utilized, and the best, which return the best result, is selected for the model. -- ant colony optimization ; resource leveling ; visibility function
Year of publication: |
2012
|
---|---|
Authors: | Garmsiri, Mohsen ; Abassi, Mohammad |
Published in: |
Journal of industrial engineering international. - Heidelberg : SpringerOpen, ISSN 2251-712X, ZDB-ID 2664907X. - Vol. 8.2012, p. 1-9
|
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Resource leveling scheduling by an ant colony-based model
Garmsiri, Mohsen, (2012)
-
Resource leveling scheduling by an ant colony-based model
Garmsiri, Mohsen, (2012)
- More ...