Resource leveling scheduling by an ant colony-based model
| Year of publication: |
2012
|
|---|---|
| Authors: | Garmsiri, Mohsen ; Abassi, Mohammad |
| Published in: |
Journal of Industrial Engineering International. - Heidelberg : Springer, ISSN 2251-712X. - Vol. 8.2012, p. 1-9
|
| Publisher: |
Heidelberg : Springer |
| Subject: | ant colony optimization | resource leveling | visibility function |
-
A common approximation framework for early work, late work, and resource leveling problems
Györgyi, Péter, (2020)
-
Benders decomposition for a period-aggregated resource leveling problem with variable job duration
Tarasov, Ilia, (2021)
-
Optimal project duration for resource leveling
Atan, Tankut, (2018)
- More ...
-
Resource leveling scheduling by an ant colony-based model
Garmsiri, Mohsen, (2012)
-
Resource leveling scheduling by an ant colony-based model
Garmsiri, Mohsen, (2012)
- More ...