Revisiting the development trajectory of parallel machine scheduling
Year of publication: |
2024
|
---|---|
Authors: | Ying, Kuo-Ching ; Pourhejazy, Pourya ; Huang, Xin-Yi |
Published in: |
Computers & operations research : an international journal. - Amsterdam [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 1499736-8. - Vol. 168.2024, Art.-No. 106709, p. 1-16
|
Subject: | Cluster Analysis (CA) | Main Path Analysis (MPA) | Parallel Machine Scheduling Problem (PMSP) | Production Planning and Control | Systematic Review | Scheduling-Verfahren | Scheduling problem | Produktionsplanung | Production planning | Theorie | Theory | Produktionssteuerung | Production control | Clusteranalyse | Cluster analysis | Algorithmus | Algorithm |
-
Minimising earliness and tardiness by integrating production scheduling with shipping information
Ma, H. L., (2013)
-
Optimal operations sequence retrieval from master operations sequence for part/product families
Navaei, Javad, (2018)
-
Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping
Hasani, Ali, (2022)
- More ...
-
Supply chain-oriented permutation flowshop scheduling considering flexible assembly and setup times
Ying, Kuo-Ching, (2023)
-
Integrated e-waste transportation using capacitated general routing problem with time-window
Pourhejazy, Pourya, (2021)
-
Wu, Gen-Han, (2024)
- More ...