Robust maintenance planning and scheduling for multi-factory production networks considering disruption cost : a bi-objective optimization model and a metaheuristic solution method
Year of publication: |
2022
|
---|---|
Authors: | Al-e-hashem, Seyed Ahmad Razavi ; Papi, Ali ; Pishvaee, Mir Saman ; Rasouli, Mohammadreza |
Published in: |
Operational research : an international journal. - Berlin : Springer, ISSN 1866-1505, ZDB-ID 2425760-6. - Vol. 22.2022, 5, p. 4999-5034
|
Subject: | Augmented epsilon constraint | Exact and metaheuristic solvers | Maintenance planning and scheduling | Multi-factory production | Multi-objective optimization | Reliability and robustness | Instandhaltung | Maintenance policy | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Mathematische Optimierung | Mathematical programming | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | Produktionsplanung | Production planning | Heuristik | Heuristics |
-
Moghaddam, Kamran S., (2013)
-
Solving a real-life, large-scale energy management problem
Godskesen, Steffen, (2013)
-
Costa, Antonio, (2025)
- More ...
-
Ziari, Matineh, (2021)
-
Fakheri, Sajjad, (2022)
-
Hamidzadeh, Farhad, (2024)
- More ...