EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Scheduling a Flexible Manufact...
  • More details
Cover Image

Scheduling a Flexible Manufacturing System with Tooling Constraints: An Actual Case Study

Year of publication:
1995
Authors: Flanders, Seth W. ; Davis, Wayne J.
Published in:
Interfaces : the INFORMS journal on the practice of operations research. - Linthicum, Md : INFORMS, ISSN 0092-2102, ZDB-ID 1207854. - Vol. 25.1995, 2, p. 42-54
Saved in:
  • More details
Type of publication: Article
Source:
OLC-SSG Economic Sciences
Persistent link: https://www.econbiz.de/10006333484
    • EndNote
    • BibTeX
    • Zotero, Mendeley, RefWorks, ...
    • Text
Saved in favorites
    Similar items by person
    • Production Planning and Control Hierarchy Using a Generic Controller

      Davis, Wayne J., (1993)

    • Looking into the Future of Simulation - As the engineering community considers systems of increasing complexity, the use of simulation-based procedures will likely increase. The author explores the possibilities of future methodologies, such as real-time simulation analyses and models capable of actually controlling the systems that they represent.

      Davis, Wayne J., (1998)

    • Evolving coordination schemes in real-time production scheduling,

      Davis, Wayne J., (1989)

    • More ...
    A service of the
    zbw
    • Sitemap
    • Plain language
    • Accessibility
    • Contact us
    • Imprint
    • Privacy

    Loading...