Scheduling a maintenance activity and due-window assignment based on common flow allowance
Year of publication: |
2012
|
---|---|
Authors: | Mor, Baruch ; Mosheiov, Gur |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 135.2012, 1, p. 222-230
|
Publisher: |
Elsevier |
Subject: | Scheduling | Due-window assignment | Flow allowance | Maintenance activity |
-
A note on scheduling a maintenance activity and due-window assignment based on common flow allowance
Chen, Ke, (2013)
-
Scheduling a maintenance activity and due-window assignment based on common flow allowance
Mor, Baruch, (2011)
-
A note on scheduling a maintenance activity and due-window assignment based on common flow allowance
Chen, Ke, (2013)
- More ...
-
Batch scheduling with a rate-modifying maintenance activity to minimize total flowtime
Mor, Baruch, (2014)
-
Scheduling problems with two competing agents to minimize minmax and minsum earliness measures
Mor, Baruch, (2010)
-
Single machine batch scheduling with two competing agents to minimize total flowtime
Mor, Baruch, (2011)
- More ...