Scheduling a tempered glass manufacturing system : a three-stage hybrid flow shop model
Year of publication: |
1-15 Oktober 2017
|
---|---|
Authors: | Liu, Ming ; Yang, Xuenan ; Zhang, Jiantong ; Chu, Chengbin |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 55.2017, 19/20 (1/15.10.), p. 6084-6107
|
Subject: | combinatorial optimisation | flow shop scheduling | tempered glass | limited buffer | machine eligibility | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Produktionssteuerung | Production control | Wahlverhalten | Voting behaviour | Produktionssystem | Manufacturing system | Produktionsplanung | Production planning |
-
A hybrid nested partitions algorithm for scheduling flexible resource in flow shop problem
Wu, Wei, (2012)
-
Scheduling of jobs with cross families in two stage manufacturing systems
Nekoiemer, Nooshin, (2015)
-
Optimal cost design of flow lines with reconfigurable machines for batch production
Battaïa, Olga, (2020)
- More ...
-
Energy-oriented bi-objective optimization for the tempered glass scheduling
Liu, Ming, (2019)
-
An FPTAS for uniform machine scheduling to minimize makespan with linear deterioration
Liu, Ming, (2012)
-
The berth allocation optimisation with the consideration of time-varying water depths
Song, Yujian, (2019)
- More ...