//-->
Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality
Kim, H.-J., (2006)
A branch and bound algorithm for disassembly scheduling with assembly product structure⋆
Kim, H.-J., (2009)
A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints