//-->
Scheduling project activities to maximize the net present value -- The case of linear time-dependent cash flows
Etgar, R., (1999)
A branch and bound algorithm for scheduling projects to maximize net present value: the case of time dependent, contingent cash flows
Shtub, A., (1997)
Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm
Shtub, A., (1996)