Scheduling Projects with Labor Constraints.
Year of publication: |
1998
|
---|---|
Authors: | Cavalcante, C.C.B. ; de Souza, C.C. ; Savelsbergh, M.W.P. ; Wang, Y. ; Wolsey, L.A. |
Institutions: | Center for Operations Research and Econometrics (CORE), École des Sciences Économiques de Louvain |
Subject: | LABOUR MARKET | MATHEMATICAL ANALYSIS | OPERATIONS RESEARCH |
Series: | |
---|---|
Type of publication: | Book / Working Paper |
Notes: | 27 pages |
Classification: | C60 - Mathematical Methods and Programming. General ; C61 - Optimization Techniques; Programming Models; Dynamic Analysis ; J20 - Time Allocation; Work Behavior; Employment Determination and Creation. General ; D70 - Analysis of Collective Decision-Making. General |
Source: |
-
Global Quadratic Optimization Via Conic Relaxation.
Nesterov, Y., (1998)
-
Hybridising Taby Search with Optimisation Techniques for Irregular Stock-Cutting.
Bennell, J.A., (2000)
-
Convex Stochastic Duality and the "Biting Lemma".
Evstigneev, I.V., (2000)
- More ...
-
Scheduling projects with labor constraints
CAVALCANTE, C.C.B.,
-
Scheduling projects with labor constraints
CAVALCANTE, C.C.B.,
-
A New Approach to Minimising the Frontwidth in Finite Element Calculations.
De Souza, C.C., (1992)
- More ...