Scheduling resource-constrained projects with a flexible project structure
| Year of publication: |
2013-03
|
|---|---|
| Authors: | Kellenbrink, Carolin ; Helber, Stefan |
| Institutions: | Wirtschaftswissenschaftliche Fakultät, Leibniz Universität Hannover |
| Subject: | Project scheduling | Genetic algorithms | RCPSP | Flexible projects |
| Extent: | application/pdf |
|---|---|
| Series: | Hannover Economic Papers (HEP). - ISSN 0949-9962. |
| Type of publication: | Book / Working Paper |
| Notes: | 30 pages |
| Classification: | C61 - Optimization Techniques; Programming Models; Dynamic Analysis ; C44 - Statistical Decision Theory; Operations Research ; M11 - Production Management |
| Source: |
-
Scheduling resource-constrained projects with a flexible project structure
Kellenbrink, Carolin, (2013)
-
Simultaneous structuring and scheduling of multiple projects with flexible project structures
Hoffmann, Luise-Sophie, (2020)
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2017)
- More ...
-
Quality- and profit-oriented scheduling of flexible resource-constrained projects
Kellenbrink, Carolin, (2014)
-
Evaluation of stochastic flow lines with provisioning of auxiliary material
Helber, Stefan, (2023)
-
Evaluation of stochastic flow lines with provisioning of auxiliary material
Helber, Stefan, (2023)
- More ...