Scheduling to minimize the maximum total completion time per machine
| Year of publication: |
2015
|
|---|---|
| Authors: | Wan, Long ; Ding, Zhihao ; Li, Yunpeng ; Chen, Qianqian ; Tan, Zhiyi |
| Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 242.2015, 1 (1.4.), p. 45-50
|
| Subject: | Scheduling | Parallel machine | Worst-case ratio | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Produktionssteuerung | Production control | Durchlaufzeit | Lead time | Branch-and-Bound | Branch and Bound | Algorithmus | Algorithm | Heuristik | Heuristics |
-
On the exact bounds of SPT for scheduling on parallel machines with availability constraints
Tan, Zhiyi, (2013)
-
Ozturk, Onur, (2017)
-
A note on scheduling on uniform parallel machines with unavailability constraints
Xu, Dehua, (2021)
- More ...
-
Scheduling to minimize the maximum total completion time per machine
Wan, Long, (2015)
-
Coordination mechanisms for scheduling games with proportional deterioration
Chen, Qianqian, (2017)
-
Wan, Long, (2021)
- More ...