//-->
Design and control of agile automated CONWIP production lines
Hopp, Wallace J., (2009)
A Diagnostic Tree for Improving Production Line Performance
Hopp, Wallace J., (2007)
Optimal dynamic assignment of a flexible worker on an open production line with specialists
Sennott, Linn I., (2006)