Simulation-based solution for a dynamic multi-crane-scheduling problem in a steelmaking shop
Year of publication: |
2020
|
---|---|
Authors: | Li, Ji ; Xu, Anjun ; Zang, Xuesong |
Subject: | Crane scheduling | heuristic | predictive-reactive rescheduling | simulation | steelmaking shop | Simulation | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Theorie | Theory | Konsumentenverhalten | Consumer behaviour |
-
A new heuristic-based bi-objective simulated annealing method for U-shaped assembly line balancing
Fathi, Masood, (2016)
-
Scheduling reefer mechanics at container terminals
Hartmann, Sönke, (2013)
-
Optimisation of idle time of a critical machine and material processing time of a flow shop
Pugazhenthi, R., (2016)
- More ...
-
Li, Ji, (2001)
-
Guanxi and the realities of career development: a Chinese perspective
Li, Ji, (2000)
-
Leadership style and employee turnover intentions: a social identity perspective
Liu, Zhiqiang, (2013)
- More ...