Simulation-based solution for a dynamic multi-crane-scheduling problem in a steelmaking shop
| Year of publication: |
2020
|
|---|---|
| Authors: | Li, Ji ; Xu, Anjun ; Zang, Xuesong |
| Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 58.2020, 22, p. 6970-6984
|
| Subject: | Crane scheduling | heuristic | predictive-reactive rescheduling | simulation | steelmaking shop | Simulation | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Theorie | Theory | Konsumentenverhalten | Consumer behaviour |
-
Mathematical models and heuristics for double-load crane scheduling in slab yards
Dong, Zixiong, (2025)
-
A new heuristic-based bi-objective simulated annealing method for U-shaped assembly line balancing
Fathi, Masood, (2016)
-
Scheduling reefer mechanics at container terminals
Hartmann, Sönke, (2013)
- More ...
-
Zhang, Ying, (2020)
-
How international firms conduct societal marketing in emerging markets : an empirical test in China
Zeng, Fue, (2013)
-
Chen, Yang, (2014)
- More ...