Single machine bicriteria scheduling with equal-length jobs to minimize total weighted completion time and maximum cost
| Year of publication: |
2014
|
|---|---|
| Authors: | He, Cheng ; Lin, Hao ; Wang, Xiumei |
| Published in: |
4OR : a quarterly journal of operations research. - Berlin, Heidelberg : Springer, ZDB-ID 2127815-5. - Vol. 12.2014, 1, p. 87-93
|
| Subject: | Bicriteria scheduling | Total weighted completion time | Maximum cost | Pareto optimal schedules | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Durchlaufzeit | Lead time |
-
Serial-batching scheduling with two agents to minimize makespan and maximum cost
He, Cheng, (2020)
-
A note on Pareto minimizing total completion time and maximum cost
Gao, Yuan, (2015)
-
Bicriteria two-machine flowshop scheduling : approximation algorithms and their limits
Jiang, Xiaojuan, (2024)
- More ...
-
He, Cheng, (2016)
-
Serial-batching scheduling with two agents to minimize makespan and maximum cost
He, Cheng, (2020)
-
Bicriteria scheduling for due date assignment with total weighted tardiness
Lin, Hao, (2018)
- More ...