//-->
Towards an integrated workload control (WLC) concept : the performance of due date setting rules in job shops with contingent orders
Thürer, Matthias, (2013)
Two-machine chain-reentrant flow shop with the no-wait constraint
Amrouche, Karim, (2020)
Batching and resource allocation decisions on an m-machine proportionate flowshop
Oron, Daniel, (2019)
On single machine scheduling and due date assignment with positionally dependent processing times
Gordon, Valery S., (2009)
Two machine open shop scheduling problem with setup, processing and removal times separated
Strusevich, Vitaly A., (1991)
Approximation algorithms for makespan minimization on identical parallel machines under resource constraints
Strusevich, Vitaly A., (2021)