Solution approaches for the soft drink integrated production lot sizing and scheduling problem
In this paper we present a mixed integer programming model that integrates production lot sizing and scheduling decisions of beverage plants with sequence-dependent setup costs and times. The model considers that the industrial process produces soft drink bottles in different flavours and sizes, and it is carried out in two production stages: liquid preparation (stage I) and bottling (stage II). The model also takes into account that the production bottleneck may alternate between stages I and II, and a synchronisation of the production between these stages is required. A relaxation approach and several strategies of the relax-and-fix heuristic are proposed to solve the model. Computational tests with instances generated based on real data from a Brazilian soft drink plant are also presented. The results show that the solution approaches are capable of producing better solutions than those used by the company.
Year of publication: |
2009
|
---|---|
Authors: | Ferreira, Deisemara ; Morabito, Reinaldo ; Rangel, Socorro |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 196.2009, 2, p. 697-706
|
Publisher: |
Elsevier |
Keywords: | Lot sizing Scheduling Soft drink industry Mixed integer programming Relax-and-fix heuristic |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Solution approaches for the soft drink integrated production lot sizing and scheduling problem
Ferreira, Deisemara, (2009)
-
Ferreira, Deisemara, (2010)
-
Ferreira, Deisemara, (2012)
- More ...