Solving real-size stochastic railway rapid transit network construction scheduling problems
| Year of publication: |
2022
|
|---|---|
| Authors: | Canca, David ; Laporte, Gilbert |
| Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 138.2022, p. 1-17
|
| Subject: | Iterated greedy local search | Matheuristic | Network design | Railway rapid transit | Resource-constrained scheduling | Scheduling-Verfahren | Scheduling problem | Schienenverkehr | Railway transport | Heuristik | Heuristics | Tourenplanung | Vehicle routing problem | Schienenpersonennahverkehr | Urban rail transit | Theorie | Theory |
-
Integrated railway rapid transit network design and line planning problem with maximum profit
Canca, David, (2019)
-
Canca, David, (2017)
-
Younes, Alyaa Mohammad, (2025)
- More ...
-
Integrated railway rapid transit network design and line planning problem with maximum profit
Canca, David, (2019)
-
Exact formulations and algorithm for the train timetabling problem with dynamic demand
Barrena, Eva, (2014)
-
Canca, David, (2017)
- More ...