Solving two production scheduling problems with sequence-dependent set-up times
| Year of publication: |
1998-12
|
|---|---|
| Authors: | Noivo, Joao António ; Ramalhinho-Lourenço, Helena |
| Institutions: | Department of Economics and Business, Universitat Pompeu Fabra |
| Subject: | Production-scheduling | set-up times | priority dispatching rules |
| Extent: | application/pdf |
|---|---|
| Series: | |
| Type of publication: | Book / Working Paper |
| Language: | English |
| Classification: | C61 - Optimization Techniques; Programming Models; Dynamic Analysis ; M11 - Production Management ; L60 - Industry Studies: Manufacturing. General |
| Source: |
-
A recoverable production planning model
Soto, Juan P., (2002)
-
Managing a Non-Cooperative Supply Chain with Limited Capacity
Parker, Rodney P., (2015)
-
Solving Two Production Scheduling Problems with Sequence-Dependent Set-Up Times
Noivo, João António, (2007)
- More ...
-
Solving two production scheduling problems with sequence-dependent set-up times
Noivo, Joao António, (1998)
-
A simple optimised search heuristic for the job-shop scheduling problem
Fernandes, Susana, (2007)
-
The crew-scheduling module in the GIST system
Ramalhinho-Lourenço, Helena, (2001)
- More ...