Some due date determination scheduling problems with two agents on a single machine
Year of publication: |
2015
|
---|---|
Authors: | Wang, Du-Juan ; Yin, Yunqiang ; Xu, Jianyou ; Wu, Wen-Hsiang ; Cheng, Shuenn-Ren |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 168.2015, p. 81-90
|
Subject: | Due date determination | Two agents | Scheduling | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Agentenbasierte Modellierung | Agent-based modeling | Durchlaufzeit | Lead time | Algorithmus | Algorithm |
-
Due date assignment and scheduling on a single machine with two competing agents
Wang, Du-Juan, (2016)
-
Yin, Yunqiang, (2018)
-
An algorithm for multi-agent scheduling to minimize the makespan on m parallel machines
Gu, Manzhan, (2018)
- More ...
-
A tabu method for two-agent single-machinescheduling with deterioration jobs
Wu, Wen-hsiang, (2013)
-
Just-in-time scheduling with two competing agents on unrelated parallel machines
Yin, Yunqiang, (2016)
-
Due date assignment and scheduling on a single machine with two competing agents
Wang, Du-Juan, (2016)
- More ...