Study on multi-objective flexible job-shop scheduling problem considering energy consumption
Year of publication: |
2014
|
---|---|
Authors: | Jiang, Zengqiang ; Le, Zuo ; E, Mingcheng |
Published in: |
Journal of Industrial Engineering and Management (JIEM). - Barcelona : OmniaScience, ISSN 2013-0953. - Vol. 7.2014, 3, p. 589-604
|
Publisher: |
Barcelona : OmniaScience |
Subject: | multi-objective scheduling | flexible job-shop scheduling | NSGA-II | energy consumption | blood variation |
-
Study on multi-objective flexible job-shop scheduling problem considering energy consumption
Jiang, Zengqiang, (2014)
-
Mishra, Bhupesh Kumar, (2022)
-
Bi-criteria scheduling with machine assignment costs
Leung, Joseph Y.-T., (2012)
- More ...
-
Study on multi-objective flexible job-shop scheduling problem considering energy consumption
Jiang, Zengqiang, (2014)
-
The evolution of production scheduling from Industry 3.0 through Industry 4.0
Jiang, Zengqiang, (2022)
- More ...