//-->
Flow shop vs. permutation shop with time delays
Rebaine, D., (2005)
Scheduling identical parallel machines and operators within a period based changing mode
Zouba, Mohammed, (2009)
Analysis of heuristics for the UET two-machine flow shop problem with time delays
Rayward-Smith, V. J., (2008)